Search results

  1. T

    Half a tiling job?

    Hi all. Is it possible to tile half of a floor and finish the job at a later date without it looking bad or going wrong? I am redoing the kitchen while using it. In a nutshell, is it possible to clear half the room of worktop, units, etc. and clean and tile the floor. Then obviously dont...
  2. T

    Opinions on this extractor ducting setup please

    i didnt really want to use flexi but i wanted to finish up the loft work so i thought a plastic to aluminium upgrade would help. i appreciate its a long length tho.... perhaps il insulate the section of tubing before the fan (so the steam stays as steam and is drawn through) and I wont...
  3. T

    Opinions on this extractor ducting setup please

    Hi all. I recently replumbed the pipework to the bathroom shower and then boarded the loft floor. It was then that I decided to replace the old extractor fan with a same but newer model and I replaced the plastic flexi hose with an aluminium one and some rigid 100mm piping at entry and exit...
  4. Untitled

    Untitled

  5. extractor ducting

    extractor ducting

  6. T

    Aqualisa Quartz pumped shower to combi boiler or mixer showe

    okay cheers all. i will replace the shower as it's cheaper than buying the new bits required for this one and there might be some second hand value. will also investigate a boiler with a higher output thanks to your advice although i understand it to be affected by the water pressure. will read...
  7. T

    Aqualisa Quartz pumped shower to combi boiler or mixer showe

    Hello all. Just stumbled upon this site while researching my problem and thought I would register as it seemed pretty good, so thanks in advance for any replies. I have an Aqualisa Quartz digital pumped shower connected to a typical boiler system with the expansion tank and cylinder, so the...
  8. Untitled

    Untitled

  9. Untitled

    Untitled

  10. shower

    shower

    shower
Back
Top