OK, left all the switches out because of inability to draw them in easily. S1, S2, etc controls L1, L2, etc.
S1 is wired up to L1 at the ceiling rose. I am simply running off of L1 to L1a, etc. in parallel to L1, which means S1 would control L1, L1a, L1b, L1c.