Hi, I bought a 6x5m DPM and had it laid for an outbuilding base - then concrete was poured around the footings over the DPM.
Turns out the DPM is too small on one side and just about comes up to where the surface of the 2nd layer of concrete will be (we are doing footings first then 200mm...