    High labour rates for boilers

    Thanks @kidgreen61 I guess what surprises me is that it seems to be possible to get a much higher day rate for boiler swaps than for any other work. I can't imagine you would get £1k for a day of CP15s, services and breakdowns. And I would have thought that a straightforward boiler swap would...
  2. B

    High labour rates for boilers

    Boxt, and two locals.
  3. B

    High labour rates for boilers

    Hi, I've been getting quotes for a replacement boiler. A Greenstar 4000 30Kw system boiler is £1600 from Screwfix. Add say £200 for a through the wall flue kit and plume diverter, and £50 for sundries - so £1850 for materials. I already have a clean system with Magnaclean and an old Greenstar...
  4. B

    Will a window lintel be ok above French doors?

    As you're not extending the opening the existing lintel will be fine. If you have a long span for bi-folds you often need an RSJ as lintels sag too much. Maybe that's what you're thinking of?
  5. B

    Plasterboard edge bead?

    If you're paying a plasterer I'd leave the beads to them. Every plasterer I've hired has told me they want to fix the beads themselves.
  6. B

    Rsj or gallows

    I'd be sending the SE a picture and asking him to tell you what's needed.
  7. B

    Floor beam as lintel

    Pre cast concrete floor beam with 3xreinforcment bars.
  8. B

    Floor beam as lintel

    I've found a load table for PCC lintels which says 140x100 is good for 3kN/m at a 3000 span which makes me think it won't be ok for 6kN/m at a 3m span?
  9. B

    Floor beam as lintel

    I'm having an extension built where there was previously a brick bay. For whatever reason (I assume the builder didn't trust the foundation) he has used a floor beam as a lintel to span the bay and then rested the ends of the beam & block floor beams on it. So effectively I have a 175x75 beam...
  10. B

    3 Phase Supply Conversion - Needed or OTT

    Where do you live? In most of the country National Grid only do transmission so unless you want a run of 400kv pylons up the drive they won't help.
  11. B

    What size cable from solar panels / battery to immersion?

    My iboost doesn't need any extra cables. Immersion circuit goes from CU to airing cupboard FCU as usual. FCU feeds iboost which feeds immersion. A wireless current clamp on the tails tells the iboost when to turn on.
  12. B

    how much mortar do i need?

    The blocks will also need tieing into the adjacent walls. Bang some 100mm nails into the mortar at each joint.
  13. B

    RCD requirements for outside socket

    @plugwash thank you, that's the clarity I needed. So it will be a deviation as concealed cables without mechanical protection require RCD. There is something about this electrical sub forum that is really frustrating sometimes. Not just me, people ask a simple clear question and get a thread...
  14. B

    RCD requirements for outside socket

    Can anyone either answer the question please or suggest a forum where I can get a straight answer?
  15. B

    RCD requirements for outside socket

    No transformer, they are 230v tools. They only do domestic.
  16. B

    RCD requirements for outside socket

    So is an RCD socket acceptable, supplied from a non RCD protected circuit? The circuit is concealed not surface run.
  17. B

    RCD requirements for outside socket

    It's an old cooker circuit on a B32. No longer used for cooker so I relocated the T&E outside in conduit and put an IP68 socket on the end. I'm pretty sure it's not inrush current. I moved them onto an RCBO because previously it was a twin RCD board and they were tripping the RCD and taking out...
  18. B

    RCD requirements for outside socket

    Hi, what is the current requirement for RCD additional protection on a socket circuit? Is it for just the socket outlets or for the whole circuit? I have builders in, who keep tripping the RCD with their mixer, pump, breaker etc. I have given them a dedicated circuit on it's own RCBO which at...
  19. B

    First fix help

    Thanks, a plumb line and marking the floor sounds like a good shout. Assuming plastic plasterboard boxes go in with 2nd fix?
  20. B

    First fix help

    Hi guys, a couple of first fix questions if I may? What do you do with accessory and socket wires? Tape in a circle and leave in roughly the right place? I have a mix of plasterboard and rendered walls so do you cut and fix back boxes in render as part of first fix (like chases) or as second...