  1. S

    Copper tank problem

    orginally the copper tank was mains fed with a pressure reducing valve. replaced copper tank changed layout to be fed from the loft tank now no pressure through taps. is ther a airlock? was it mains fed because of poor pressure? the tank filled up andso did the lof tank
  2. S

    Copper tank issue

    Replaced a leaking copper tank. Went upstairs in the loft mains water is bypassed to direct feed with pressure reducing valve and the vent is capped. The new tank started to balloon. Revert to as it shud incapped the vent and direct feed to the tank. Now no pressure through hot taps. I...
  3. S

    Copper tank problem

    Replaced a leaking copper tank. Went upstairs in the loft mains water is bypassed to direct feed with pressure reducing valve and the vent is capped. The new tank started to balloon. Revert to as it shud incapped the vent and direct feed to the tank. Now no pressure through hot taps. I...
  4. S

    Satelite installation

    Needs some advise please. Just renovated a house and left all the coax satelite cables in the loft. My question is do i take all the cables direct to the LNB (quad) or is there a switch i can buy 4 in and 1 out to the sattelite?? Or any additional gadgets i need for the install. Freeview only
  5. S

    Contactor wiring

    We have rewired 18 bedroom conversion. We have installed a Landlord circuit which is a long coridor. The bank of lights are with sensors. ie every door you open the lights come on some sensor as 3 lights, some 6 and so on. Total sensor are about 6 I hope that makes sense. Now what i would like...
  6. S

    Reversion Application

    Thanx Notch No mention of disabled access on building regs drawings Also would it not been picked up planning during the process
  7. S

    Reversion Application

    A Friend of mine who is a building contractor built 2 identical houses via aproved inspectors. Many different inspectors (due to leaving) visited the property through the build. Cut the story short the second to last inspector made final visit and advised a hand rail and other minor things...
  8. S

    Roller shutter problem

    I have 2 shutters One is entrance to the garden with the NVR is inside the utility room. The 2nd shutter separates car porch and rear yard. NvR is in a waterproof inclosure box side of the shutter. You can have the Nvr anywhere considering the getting a good signal from the remote fob
  9. S

    FIRE ALARM QUESTION

    I require some urgent help please we have just rewired HMO property over 3 storeys ground floor, first floor and the loft. We have installed to building regulations i.e. smokes in each area with emergency lighting. the property now all finished i.e. plastered and painted with just the carpet...
  10. S

    63mm Manifold

    Require some advice New water 63mm supply to a 18 flats Require a manifold to distribute to each flat Prices for 6 way manifold are about £400 each so need 3 thats over £1200 and rest of the fittings. Is ther a cheaper option we can create or make etc
  11. S

    RCD 3PHASE

    Thank u so.much for the advise
  12. S

    RCD 3PHASE

    Ther arr 3 rollers shutter on 3 x 3phase mcbs and 2 wall sockets 3 phase
  13. S

    RCD 3PHASE

    Some advice please. A warehouse has a new distribution board fitted. Very nice all schneider breakers and board. 3 Rcbos single phase breakers but the 3 phase breakers are just MCBs Shud they be RCBOs?? Not mentioned any observations on the the EIC
  14. S

    100amp fuse overload

    D Sorry yes yur correct incorrect info Tot 5 flats each appliances in each flat
  15. S

    100amp fuse overload

    Orginal post it states 5 flats off one 100amp supply so all appliances x 5
  16. S

    100amp fuse overload

    Hi aptsys For future reference how to do u calculate the max load?
  17. S

    100amp fuse overload

    Hi need some advise please Attended property to re wire 5 flats. The flats has electric only single phase 100amp fuse. Now the owner wants in each flats 5 of each 8.5kw shower x 5 5.5kw water heater x 5 2 kw wall heaters x 10 plus 3 kw hob x 5 Thats over 100kw from each flat an thats not...
  18. S

    First fix

    Im waiting for a callback from Openreach landlord department and see what they say
  19. S

    First fix

    Spoke to virginmedia construction. They advised to run rg11 to each flat from the meter room in the basement. Just 1 RG11 in each flat, telehone will come from the unit in the flat
  20. S

    First fix

    Ah so if the service proviser installs modems.in the meter room than cat 5/6 to each flat?? What is all in on modem/ wifi router that will be situated in the flats so what cable for that? Thanks