Hi
I need to re-site my control panel so need to remove power while doing so.
I guess the bell box will activate when I do this.
I have the engineers codes. Is there a way to ‘hold off’ the bell or similar while doing the panel move?
Is it acceptable to fit pvc cable inside plastic conduit and bury under a concrete path by cutting out a section of concrete, burying the conduit then re-concerting over?
Is there a minimum depth it needs to be buried.
Thanks
I’m about to replace an old ceiling with new plasterboard.
I need to create an access hatch. is it best to cut the access hatch in afterwards. As in board the whole room then use a pad saw to cut an opening between the joists?
I have some timber to build the hatch surround. How much should the...
Verities R8
I need to move the control panel about 2 feet from its current location.
there is enough cable to do this without extending it.
Can this be done without the bell box activating?
Cheers