  1. M

    SWA

    SWA needs to be 600m in ground if buried, is that correct?
  2. M

    PAT Testing

    Completed a PAT course a good few weeks ago. I found it pretty strange as i passed with flying colours, but we done no practical, just had a demonstration. :roll: Sat thinking about doing some PAT for my uncle's office, when come up with some questions which i hope someone can answer, as no...
  3. M

    NICEIC forms

    When it says points served on NIC forms, for lights does it mean one point = one light or does it mean if say 3 lights are turned on by one switch that is counted as one point?
  4. M

    Voltage

    On a 230V supply what is U & Uo? I Know one is 230V and other 240V but which way round?
  5. M

    Certificates

    So its just a case of giving them a PIR cert? It's just they rang today asking for a COC before returning supply. I had done a PIR for main contractor but supply was down due to fault. Fault was rectified but they want Coc before returning power, so if i leave a copy of PIR will that be sufficient?
  6. M

    Certificates

    Supply company wnot put supply back on until recieve cert of compliance as theior was fault on DB which has now been cleared but want COC before returnig supply, will minor works be enough?
  7. M

    Certificates

    What is a certificate of complaince? Is it a minor works cerfificate to say repairs have been made?
  8. M

    Certificate of compliance

    I need a certificate of compliance template becasue supply fuses blown at a job and DNO want a certifiacte before they will return supply. can anyone suggest website i can get one?
  9. M

    Installation life span

    So would you say basics would last min 25yrs but new regs will come in at some point and alterations would be needed?
  10. M

    Installation life span

    How long would you say a new domestic electrical installation would last before needing re-wiring, in a normal environment? Its just a customer has an installation without CPCs in the lights, so obviously before 1966, needs a re-wire and wants to know how long a new installation should last.
  11. M

    Pendents

    But why round lights?
  12. M

    Pendents

    Why do flies, fly in circles around ceiling pendents? :evil:
  13. M

    Upgrading Bonding

    So what would you do in my situation? I propose to list as departure that cant verify if water bonding needed due to inaccessibilty, then write in comments that no electrical work can be carried out until established whether water bonding is needed. Would that be to the regs?
  14. M

    Upgrading Bonding

    But what if friend is unwilling to allow me to remove his tiles? Wher do i stand there? Do i write it as departure and explain in comments?
  15. M

    Upgrading Bonding

    Upgraded it for a friend, i've done no other work at his house. He had no bonding to gas and a 6mm as main bond so i said i'd upgrade for him. He dosnt want me breaking his tiles to see if it plastic or metal
  16. M

    Upgrading Bonding

    Is there no other way of testing apart from what i tried? Dont wanna bother neighbours. Isn't putting requires further investigation on MWC sufficient? What if customer only requests upgrade main and gas bonding? I cant make them have water done if it means ripping there new tiles off can i?
  17. M

    Upgrading Bonding

    So how do i check to see if its metal? I put lead on tap and on stop cock to see if there was a reading but nothing, so presume plastic, is that ok? Can't i simply state this on MWC? Or say customer only wanted Main and Gas doing as Water would be to much mess for now?
  18. M

    Upgrading Bonding

    Just upgarded main bonding from MET to CU and installed bonding to gas from MET. The Water obviously may need bonding but the problem is the stop cock is enclosed behind tiles in a cloakroom with only tap stuck out. there's no way of seeing or testing if the pipes are copper or plastic...
  19. M

    Testing

    When adding to an existing circuit, you test circuit before adding to it to check it is ok right? Then the test circuit you are adding right? But on a MWC in the IR section, are you putting down IR of whole circuit, or bit adding to it? Slightly confused thats all
  20. M

    Powering Pond Pump CU

    Is it ok to power a pond pump control unit straight from an outdoor lighting weatherproof box using flexible cable? The WP box is supllied by SWA from the house from a DP FSU. The flexible cable would run from the WP box under the decking to the other side and the Pond Pump CU is secured to the...
Back