    thermal boards or not

    marmox it is then. i knew deep down i wanted some sort of board under the underfloor heating it makes sense. thanks
  2. C

    thermal boards or not

    hi. MY plumber/tiler who will be laying the tiles and underfloor heating says. thermal/blue boards are a waste of money. It will be ok straight onto ply(wpb) he says the blue boards and such might make the tiling crack through expansion and stuff, and because i have some insulation...
  3. C

    thermal boards or not

    Marmox it is then Cheers fellas
  4. C

    thermal boards or not

    Hi I haven't dismissed them I just thought you said thermal boards were better than those blue boards. Cheers
  5. C

    thermal boards or not

    thanks for that richard c so i will go with something like this http://www.energysaving-shop.co.uk/catalogue/products/underfloor-heating6mm-thermal-tile-insulation-boardheat-mat.asp?utm_source=GoogleBase&utm_medium=ProductSearch and not this...
  6. C

    thermal boards or not

    hi. I am going to lay electric underfloor heating on 25mm wpb should i use thermal board or just the normal foam /polystyrene boards? thanks in advance
  7. C

    Substrate for new bathroom floor to tile on

    thanks i will use wbp ply for the floor and 12.5 water proof tile backer board for the walls thanks again
  8. C

    Substrate for new bathroom floor to tile on

    thanks for that i will go with 25 mm ply and go from there. also tiling all walls which are currently just stud work,what's the best to put on them? thanks in advance again.
  9. C

    Substrate for new bathroom floor to tile on

    Hi guys, I have just done a new loft conversion and I'm about to tackle the bathroom floor with underfloor heating. Right now I have got floor joists down and I was wondering what's the next step. Is the following correct? 1. Start with 18mm ply screwed down into the joists. 2. 6mm...
  10. C

    boiler in loft hallway

    didn't do it myself
  11. C

    boiler in loft hallway

    is it not being 300mm from tiles the only thing wrong or is there more.he could have put it in either way horizontal or vertical but i liked the look of horizontal.and he agreed.he will come back and change if i need to
  12. C

    boiler in loft hallway

    whats the reson for it having to be 300mm from tiles
  13. C

    boiler in loft hallway

    the plumber that installed it said it was ok, has he got it wrong ? me being a roofer made the weathering slate.shall i extend the flue or change it to a veritcal flue heres some pics whats the worst that can happen with this situation
  14. C

    boiler in loft hallway

    or would just i normal cupboard do. also i think the bottom of the flue outside is less than 300mm from the tiles will i have extend it out further
  15. C

    boiler in loft hallway

    the boiler is a vaillant 937 just looked at instructions no mention of must be vertical flue also it does say in the book about it does not need venting in a cupboard but what about fire proofing the cupboard . should i put fire door on and fire board on the inside of cupboard.. thanks
  16. C

    boiler in loft hallway

    ok gonna check flue instructions now what do you think about cupboard thanks
  17. C

    boiler in loft hallway

    hello everyone. i am doing a loft conversion and had my my boiler installed now i would like to put a cupboard round it. 1 do i need to fire proof it 2 do i need to vent it heres a pic to help
  18. C

    Rendering stud gable

    Hi can anyone help answer this one. My gable is built in 6x2, overclad with osb board. I then have breathable felt then master board. now here is the question - I will use rib lathe, so do I fix battons now then breathable felt then the rib lathe, or can I just fix breathable felt on top of...
  19. C

    Insulation in a timber gable

    Hi guys I am doing a loft conversion and changing a hip to a gable. I am going to build the gable out of timber stud, possibly out of 7x2s or 6x2s. The new gable will be built on top of a 9-inch solid existing brickwork. The outside of the new gable will either be tile-hung or rendered...