Search results

  1. A

    bathroom lighting

    ok i will plug it into a switched s/o
  2. A

    bathroom lighting

    all lights require hard wiring at some point thats how they get there electric :shock:
  3. A

    bathroom lighting

    OR A S/O SO WHY DOES IT MATTER THE SUPPLY CONNECTION IS OUTSIDE THE BATHROOM
  4. A

    bathroom lighting

    VIA FUSED SPUR BOX VIA SWITCH TO TRANSFORMER ALL OUTSIDE THE BATHROOM
  5. A

    bathroom lighting

    Yes they are modular lights plug in connectors on lv and elv in a special location reed 3c
  6. A

    bathroom lighting

    Look at EFLImpudense comment 3c
  7. A

    bathroom lighting

    States that modular wiring systems installed in a bathroom or special location are NOT NOTIFIABLE
  8. A

    bathroom lighting

    I was refering to guidence note K
  9. A

    bathroom lighting

    Extra low pre assembled CE marked lighting sets in bathroom are they notifiable :shock:
  10. A

    Qualified Electrician but not Part P

    I think the law says fixed wiring should comply with BS7671 2008 NOT PART P
  11. A

    propective short circuit current

    Yes i am a qualified electrician for 40 years and authorised to work on networks upto 132kv The only reply i have is to use a loop tester this will only measure the neutral earth fault back to the distribution transformer .As on distribution mains the neutral conductor has a smaller csa than...
  12. A

    propective short circuit current

    Can anybody please tell me how to calculate the prospective short circuit current into me property :roll:
  13. A

    Qualified Electrician but not Part P

    I was refering to part p table 2 general guidence note k if this work is not notifiable then building control will not be involved .the fact Building Control have been notified under the full plans application does not make the work notifiable. :lol:
  14. A

    Qualified Electrician but not Part P

    I hope someone can help i am a qualified electrician and have been for 40 years.I moved to work on the high voltage side of the syetem a few years ago so do not have part p .Iam completing a loft conversion under a full plans appplication .The lighting and power circuits will be extensions of...
Back
Top