Search results

  1. S

    Minor works cert

    Job was 1 Replace fan in bathroom. Replace existing fan that sounds like chain saw with new fan. 2 Repair Cooker socket. Cooker fed in 10mm to cooker switch from cooker switch in 10mm again to 2 single sockets in cavity under hob and behind cooker. one socket fed in 2.5mm and...
  2. S

    Blu cube speakers and QED stuff

    wired a speaker system in a flat. contains 4 sets of speakers, one 4 way switch and a CD player. the speakers are blu cube, the QED products are the wall recessed volume controls, 4 in total the 4 Way switch The CD player is ONKYO. wired all volume controls fine and wired...
  3. S

    Offsite deactivation of burglar alarms

    alright, ive been recently asked about burglar alarms and whether they can be remotely deactivated in case of false alarm. the owners of said flat live over an hour and a half away and would like this option. i am not a burglar alarm installer and have told them this. but curiousity killed...
  4. S

    leccy board seals

    I heard that you can go on a day course in changing meter tails, but apparently this allows you to be able to legally replace seals. APPARENTLY! now i dont know if this is true or not and would like it if you all may be able to help me with this query?[/b]
  5. S

    Points served Question

    1 light fitting has 3 GU10 lamps in it. my question is is it 1 point served or 3 Due to the number of bulbs
  6. S

    just some photo's for ya's

    i thought i would submit some pictures, some where im possibly reqiring in the future luckily not alot of time will be spent in here. asbestos flash pad in mem switch, tasty
  7. S

    Hager sollysta gear

    are the hager sollysta range reasonably priced compared to mk havent had chance to ring the wholesalers yet and i've heard they are alright to fit just wondered what other people thought
  8. S

    MEM switch fuse asbestos??

    is that asbestos in there? pulling the fuse out isnt enough to disturb it is it
  9. S

    Sub mains question

    im going to run a submain. i got the idea of running the main tails from the meter into a SP+N 100A switch fuse unit then submain tails from that upto the flat. there are several flats in the building so is it best to fuse it with one of the units so the cable is not just reliant on the...
Back
Top