Search results

  1. A

    Loft Conversion, new consumer unit?

    Hi all, My loft is being converted, the electrican is looking to extend the upstairs ring into the loft, for 3 sockets. My CU is has a plastic case. Would the loft be cased as a new install and therefore require the CU upgrading? Thanks
  2. A

    Floor Joist end bearing support depth

    Thanks for the response, appreciate it
  3. A

    Floor Joist end bearing support depth

    Hi, My structual engineer has specficied an end bearing support of 100mm on each of my floor joists. They will be supported using timber to timber joist hangers that are nailed to a timber nailer in a UC. All the timber to timber joist hangers i can find have a seat depth of less than 100mm...
  4. A

    Universal column timber packer for joist hanger

    Thanks for the reply. Didnt mention in the OP that it is for a loft conversion and that I need to use joist hangers to keep the joists as low as possible for head space. As an aside is there any issues with forward and aft movment of the joists, if they were hung completely below the steel as...
  5. A

    Universal column timber packer for joist hanger

    Hi all, I have a 152x152x30 UC. Where the web meets the flange on top and bottom there is a root radius of about 1cm. I intend to place timber inside the steel web so that I can nail joist hangers to the face. I relatively simple question but is it more common to round off the edges of the...
  6. A

    Restraining Joists that are on hangers

    Hi, I'm tackling a loft conversion and hanging my joists fully below the support (152×152×30 UC) with Strong tie JHA450 hangers. Strong tie have confirmed this will still provide at least 4kn of strength. However I need to prevent the joists from swinging forward and aft as they are completely...
  7. A

    Mid terrace RSJs

    Hi all, Just after some advice on installing RSJs for my loft conversion. My structural engineer has advised me that I will need 3 RSJs across my roof space for my loft conversion, which is pretty standard for a Victorian mid terrace I believe. My question is, what is the easiest way to get...
  8. A

    Heatslave 15/19 struggles to fire

    Thanks Bob, are any of the settings you have mentioned easily tweaked or do they all require specific equipment/knowledge and therefore an engineer call out.
  9. A

    Heatslave 15/19 struggles to fire

    Found the service report from September, not sure if this helps.
  10. A

    Heatslave 15/19 struggles to fire

    The photocell was completely covered in soot. Cleaned it up but unfortunately this hasn't solved the fire up issue.
  11. A

    Heatslave 15/19 struggles to fire

    Thanks for the replies guys. Not sure when the pressure levels were adjusted or flue ways cleaned. Sounds like a another service might be required then.
  12. A

    Heatslave 15/19 struggles to fire

    It was serviced about 6 months ago.
  13. A

    Heatslave 15/19 struggles to fire

    Hi all, I'm after some advice on the issue I'm having with my Heatslave. The boiler is struggling to fire and will eventually go into lockout before igniting if I dont stop the start sequence. When the start sequence begins I can hear the fan motor running and the spark, however there is no...
Back
Top