Hi,
We have built up to DPC, and will be pouring the slab soon. The plan is to fill the area, level it with some 2x4, then bull float it, and finally finish it with a swimming pool trowel. I have some questions I'd like answered.
1. Once I've bull floated it, do I need to use a hand held...