Hi all
Noticed today damp patches in each corner of window top and bottom window was fitted 3 yr ago
Reveals were plastered 6 month ago Any clues please ?
Hi guys
Roof was replaced 2 years ago gutter clips set in place drip trays scewred on top
Then tiled, however the clips weren't set properly and theres hardly any run off along
The gutter so I taken the gutter off however I carnt get to the screws on the gutter
Brackets.....would it be ok to...
my bathroom is very cold even in summer no sun through window at all to warm it up
Even last nite at 9pm was cold had the log stove on living/kitchen so both rooms
Warm.....not putting central heating on just to warm the bathroom
So was looking at underfloor.....question is I have a concrete...
Ok cheers I understand
But if this could help
Need a camera for 50m at back one camer for 30m at front
And two 20m cameras for each side need 2tb
And would like exallant nite vision.....
Hi thanks for the quick response
Yes pitch black....open fields
So if say you were to live here
What would you recommend with
Distances I've given.....thanks
hi all
Looking for a 4 camera kit for my property....detached bungalow in open
Rural ground...front of house to front gate measures 105ft width is 100ft each side...the
Back measures from kitchen window which I want to put on a 3metre pole...I.e my tv pole.... its centre of house and measures...
hi all....sofits on new build
10mm hollow or 10mm solid
£10 for a 5m length of hollow or £22 for solid
What would you choose and why (p.s if it was your place).....cheers
Rafters 100mm deep need 200sqm to do the job....she doesn't
Want to pay for cost of 100mm on bottom and 200mm on top
So do I just put the 100mm down or put 170 or 200 down she
Only wants 1 layer to keep costs down ?.
Cheers....will need check, so if say rafters 100mm deep then its 100mm infill then 100mm
On top or 170mm....could I get away with just the infill of rafters to save costs would it
Be adequate
hi all, just had roof done breathable felt concrete Marley pan tile
I need to insulate now. Detached bungalow on floorboards, from what
I've read, 170mm then 100mm on top is the correct or would 170mm
Be enough....? Thanks
hi all....boiler coming up to 12 months old what's the first
Service consist of.....and do the trade do the same procedure
To the boiler Every 12 months.....thanks
hi all....need a decent shower not sure which one as loads on the market
Will be connected to worster heatslave 32kw oil combi very good water pressure
Coming in so wasn't thinking of a pump......any recommendations please..