    Two Storey Side Extension Timeline - Our Story

    Well a lots happened since my last post. The build has hurtled along pretty quickly. All wall structures are complete, roof timbers are in and the tiling of the roof is due to be completed today. The insulation upstairs is in and the ceiling boards have also gone in upstairs as well as the...
  2. R

    Two Storey Side Extension Timeline - Our Story

    3 weeks in now and we’re about to install the first floor beams in the next day or 2. The builders have done a great job this far helped massively by the sunny weather throughout the foundations stage haha. I’ve been impressed with all the workmanship and work ethic throughout and ignore the...
  3. R

    Two Storey Side Extension Timeline - Our Story

    A week in and most of the Trench Blocks are now in. As smooth a first week as you could hope for. Behind the frontline we are trying to sort bathrooms and kitchens in readiness for that time.
  4. R

    Two Storey Side Extension Timeline - Our Story

    B12E3361-29B3-4C3A-B21E-F66C141B4355 by Rich11 posted 20 May 2020 at 6:00 AM268B0A95-E6C5-4ED7-B66D-6CCAF029923A by Rich11 posted 20 May 2020 at 6:00 AM31BE9CF3-09D7-41AD-BA3C-CEEFE538064B by Rich11 posted 20 May 2020 at 6:00 AM04803DBB-CDD1-40FD-A59F-3198520C5563 by Rich11 posted 20 May 2020 at...
  5. 7887F279-D86B-405C-80D1-78F12AEEA6F2

    7887F279-D86B-405C-80D1-78F12AEEA6F2

  6. 55A2DF25-9CBD-4018-8256-6B2DC9EAC6EA

    55A2DF25-9CBD-4018-8256-6B2DC9EAC6EA

  7. 04803DBB-CDD1-40FD-A59F-3198520C5563

    04803DBB-CDD1-40FD-A59F-3198520C5563

  8. 31BE9CF3-09D7-41AD-BA3C-CEEFE538064B

    31BE9CF3-09D7-41AD-BA3C-CEEFE538064B

  9. 268B0A95-E6C5-4ED7-B66D-6CCAF029923A

    268B0A95-E6C5-4ED7-B66D-6CCAF029923A

  10. B12E3361-29B3-4C3A-B21E-F66C141B4355

    B12E3361-29B3-4C3A-B21E-F66C141B4355

  11. House Build

    House Build

    Our house build
  12. R

    Two Storey Side Extension Timeline - Our Story

    Following consultation the council asked us to redesign the front of the house as setting back the extension in our case made the house look disjointed. I totally agree but we had tried to make it how we thought would be best accepted. So anyway it was re-designed with the extension brought...
  13. R

    Two Storey Side Extension Timeline - Our Story

    The actual start of things began in April 2019 and we secured our re-mortgage to get the ball rolling in June 2019. We were limited on this and so we have a budget we need to stick to. I'll be honest I'm a little worried. Until we get the builders quotes I've no idea what its going to cost...
  14. R

    Two Storey Side Extension Timeline - Our Story

    Hi, I've watched this forum with interest over the weeks and thought I'd post the progress with the two storey extension we currently in the process of building. It all started about a year ago when I wanted to move house for more space but the Mrs preferred to stay put due to good location to...