Search results

  1. T

    No insulation in the outbuilding

    I have a out building at the bottom of my garden and the walls have been plastered and painted, which I use as a gym. But the problem is it's freezing cold, simply because the builders never put insulation in. What are my options? Take it all off, pump-in insulation, etc?
  2. T

    GPR roof

    I had a GPR roof installed on a wooden cabin a few years ago by a builder that insisted on doing it rather than a felt roof. He's since gone bust but I've paid to get it repaired twice now by two parties and still it leaks, it's costing a lot of money and the internal ceiling is all moldy and...
  3. T

    Concealed toilet opinions

    Hi all I'm getting a new bathroom done, I'm looking at a concealed toilet but worried if I get it the plumber will moan about the instructions and how difficult it is to fit. So I'm asking any plumbers for recommendations, which ones are easiest to fix (for a decent price) I'm keeping an eye...
  4. T

    Builder terminate my contract

    After my builder messed up trying scrimp on money and me picking flaws in his workmanship, he's decided to take his tools and tear up the contract, without an explanation. I guess he's decided the cost to rectify all his balls ups and the cutting corners is of more value than the current...
  5. T

    celotex thermal and rockwool

    If a builder has stated that he would do the following:- "All walls to be insulated with celotex thermal and sound insulation" And he then uses only rockwool on all the internal walls (I think the ceiling has Celotex). Is that an issue or a sign he is cutting corners or giving me cheap...
  6. T

    Breather membrane behind cladding

    I'm in dispute with my builder. He's built me a timer outbuilding where the externals are external OSB with cedar cladding nailed on top. So I looked at his quote and he said he would put breather membrane over the osb and then the cladding on top. I know that this wasn't done. But is it...
  7. T

    joins in the cladding

    I paid a builder to build me a garden cabin and for the cladding he used cedar. He verbally told me that he was going to using complete strips, 2.5m long and clad it vertically. As the cladding was one of the last things to be done, his margin on the whole job I guess starting to dwindle and...
  8. T

    Builder under estimated skip size needed for an excavation

    I'm in a dispute with my builder where I've paid up front for him to excavate earth from the back of my garden. In his quote he stated that all waste soil to be disposed of by hire of a skip. So he orders an average sized skip when really he should have ordered a really big one like a 12...
  9. T

    Retainer

    Before taking up a building job, the builder agreed to a 30% retainer to be paid on completion, it was 30% because we didn;t know him so it may have been a little high but he agreed to it. So far he has been a pain in the ass. Alway disappearing on other jobs and our job has over run by 3 weeks...
  10. T

    Wiring a fan from the main circuit

    I\\\'m trying to connect a new extractor fan in my bathroom, it\\\'s powered from the bathroom circuit and not the corded light switch, and the on/off control comes from the fan\\\'s humidity sensor. Out of the wall comes for wires, red, blue, yellow and earth. In my fan there are two...
  11. T

    Power Flush and Chemical Flush

    Hi All I've just had new combi system installed, but the company that did it just did a chemical flush and not a power flush. is this a major problem and did they cut corners. I did remember from other quotes that some companies said that systems that are not power flushed could invalidate...
Back
Top