Thanks, we hacked off about 2 inches of that nasty cement inside and out in order to plaster/point/render with lime. :shock:
The screed is 60mm, the UFH won't be on until September. I installed it in 2 stages, stage 1 (Kitchen/Utility/WC/Study) was working through the winter, stage 2...