    How important is it keeping a extension square

    How critical is it that that a extension is perfectly square? I am in the process of building my own kitchen extension i am about half way up, I started with the corners using a builders square and i am checking that is vertical as i go but thats proving quite hard because some blocks are...
  2. H

    joins in cavity wall insulation

    that could be the stuff, where would get that from?
  3. H

    joins in cavity wall insulation

    xtratherm/ celotex foam type it has tung and groove but i have to cut it in some places and i want to seal the join and i have heard there is tape available.
  4. H

    joins in cavity wall insulation

    Hi all, is there a joining tape for partial fill cavity wall insulation, if so does anyone know where i can get it? Thanks.
  5. H

    how many air bricks are needed?

    Hi is there away to calculate how many air bricks i should have in a kitchen extension 20ft long 11ft wide with wooden floor? Thanks
  6. H

    dpc behind furfix

    do i need to run dpc up the exsisting wall, behind where i have fixed my furfix ties? if so how far up the wall.
  7. H

    Air brick under dpc

    Under building regulations can an air brick be fitted under dpc level?
  8. H

    vent brick above floor level

    i am building a kitchen extension and have just reached damp course, i now have to put in vent bricks. i am told that these have to sit on top of dpc, the problem i have is that i had to step up dpc so now the new vent brick wont be completely under floor level, i would have to cut out a section...
  9. H

    dpc level cavity fill

    I have gone one block high, because ive done a trench fill foundation and i have hade to step up my dpc about 50mm
  10. H

    dpc level cavity fill

    ok my cavity is only one block high to dpc, so that would only give me about an inch of concrete to allow my 225mm clearance is that enough?
  11. H

    dpc level cavity fill

    thanks noseall can i ask why does this need to be done? On the building regs it shows a picture of the mix being sloped towards the outside wall of the cavity.
  12. H

    dpc level cavity fill

    8:1, Being 8 Parts Agregate (chippings to dust) to 1 part cement
  13. H

    dpc level cavity fill

    Hi can someone please tell me how im supposed to fill my cavity up to dpc level, I have been told that it should be a lean mix of contrete sloping towards the outside leaves. Is this correct and what is considered a lean mix? Thanks