Search results

  1. L

    What do you do with your excess DPM?

    id cut it off at about 15mm above your dpc so it comes just above the top of your laminate floor. then dot and dab your walls. pack up the plasterboard 5-10mm off the floor to leave gap preventing any damp being drawn up the plasterboard.
  2. L

    What do you do with your excess DPM?

    how far is the dpc above your finished floor level
  3. L

    Do I need a Plasterer, Builder or both

    youll need building regs approval for any structural alterations
  4. L

    Do I need a Plasterer, Builder or both

    any builder worth his salt will be able to carry out the patching up of the plaster youll need
  5. L

    Sto Render

    1. yes 2. need training really to achieve decent results 3. no - need to be approved contractor try three local tradesmen for advice / quote
Back
Top