We had the front of our house fitted with dry verge about a month ago, after we had the front rendered in the autumn, to tie everything in a bit and neaten it up. Earlier this week I noticed that there is a rusty coloured water dripping from the fascia board end where the dry verge ends. It's...
Hi
We’re mid way through our house roof being replaced by roofer I’ve used before but am starting to be a little nervous about some of the standards I’m seeing so far?
Firstly they’ve just fitted a small velux and whilst I can see the flashing needs trimming in the valley the tiles on the...
I live in a 1900s terraced style house, it is joined back to back as opposed to having neighbours either side, meaning it has two gable walls.
The house is a peculiar shape and on the right hand side it widens towards the back, from a Birdseye view it forms a trapezium. The roof features Roman...
Hi everyone,
I'm in the middle of a self build rear extension. It's a single storey 2.6 x 7.3m ground floor kitchen extension which is the same width as existing detached property.
I've built up as far as wall plate height and almost ready to set wall plate (100mm x 75mm) as recommended by BCO...
Hi
I'd welcome some advice in regards to the slate roof verge detail required on my new garage build.
I'm clear on the setting out & fitting process for the battens & tiles it's just the detail of verge I'm a bit unclear on.
Would someone be so kind as to point me in the direction of a decent...