I'm about to lay a new patio, and before I do, I want to put some drainage in. I'm looking at connecting into the current underground drainage, but looking for some advice on the easiest way to do that.
The current set up is as per the picture - I would be adding another junction next to the existing one, to take the water from my surface drains. What should the easiest way to do this? Opening up the current joins seems rather difficult without digging up a much wider area. Am I going to need to just cut into the pipe to allow enough movement to separate the pieces, or are they locked in?
Any advice very welcome please!