If Bonding to Gas & Water are only 6mm2 instead of 10mm2, is it still ok to carry out minor additions or alterations?
If a CU was to be upgraded, does the 6mm2 have to be upgraded to 10mm2 or can it be marked as departure on Installation cert?
If a CU was to be upgraded, does the 6mm2 have to be upgraded to 10mm2 or can it be marked as departure on Installation cert?