Hi there
I have been searching the internet and cannot find any advice regarding this, so hope someone on here might be able to help!
At the end of our garden we have an underground air raid shelter - and the roof protrudes approximately 1ft off the ground.
At present, two-thirds of the width of the garden is flat and level and has a single pre-fab garage on it. We want to flatten the last 1/3 where the shelter is to allow for a double garage.
I guess the top of the shelter is re-inforced concrete so how would I break it up? We're hoping to knock it in and fill in the void with hardcore before levelling the top off. Sound sensible?
Any advice on how to break and opinions on what we're doing would be much appreciated!
Emma
I have been searching the internet and cannot find any advice regarding this, so hope someone on here might be able to help!
At the end of our garden we have an underground air raid shelter - and the roof protrudes approximately 1ft off the ground.
At present, two-thirds of the width of the garden is flat and level and has a single pre-fab garage on it. We want to flatten the last 1/3 where the shelter is to allow for a double garage.
I guess the top of the shelter is re-inforced concrete so how would I break it up? We're hoping to knock it in and fill in the void with hardcore before levelling the top off. Sound sensible?
Any advice on how to break and opinions on what we're doing would be much appreciated!
Emma