Hi All
I`m just about to start on the family bathroom and am going to box in the pipe work along one wall with a slight inclined soil pipe running the length of that wall above a concrete floor and out to a soil stack to ground level.
My question is that the order of the bathroom furniture is first a sink on the right end wall, then a bidet, then toilet and finally a bath all plumbed into the same soil pipe with tee-joints and fitting with bottle traps. My concern is that the bath will be after the toilet waste and that waste may enter that. Its possible that I could get the bath waste into the soil stack outside the house but its a difficult job.
Anyone have experience of this arrangement know if its going to be ok?
Thanks alot
Paul
I`m just about to start on the family bathroom and am going to box in the pipe work along one wall with a slight inclined soil pipe running the length of that wall above a concrete floor and out to a soil stack to ground level.
My question is that the order of the bathroom furniture is first a sink on the right end wall, then a bidet, then toilet and finally a bath all plumbed into the same soil pipe with tee-joints and fitting with bottle traps. My concern is that the bath will be after the toilet waste and that waste may enter that. Its possible that I could get the bath waste into the soil stack outside the house but its a difficult job.
Anyone have experience of this arrangement know if its going to be ok?
Thanks alot
Paul