Hi,
Just need some advice, what ive found out so far is.
1, knock of peaks on artex
2, pva 3:1
3, Bonding to fill holes
Now, how long do i leave until i can multi finish on top of the bonding? part of the artex is off, about 0.2 sq meter, can i bond this to level or should i use sand and cement?
Do i need to PVA the bonding?
Thanks
Andy