- Joined
- 5 Jan 2005
- Messages
- 119
- Reaction score
- 0
- Country
Looking to move into a resale dormer bungalow in North Wales built 1970.
CH + DHW system made up of gas back-boiler (sorry, no details), vented indirect cylinder and C-plan arrangement with what appears to be a single pipe CH circuit! (... World copper shortage...) Switchmaster mech programmer and Satchwell (horizontal dial) stats.
There is two room stats, one in living room and the other in the hallway. There is no cyl stat. There is an immersion heater installed.
The pump 'appears' to be in the return of the CH circuit.
The F&E feed goes to the bottom of the cyl coil and the vent to the top.
With regards to control upgrade what can be done?
It's probably better to upgrade the system to S or Y plan fully pumped if I'm not mistaken. But what's best for Part L and improving current control?
Thanks in advance for any advice.
UselessFcuk
CH + DHW system made up of gas back-boiler (sorry, no details), vented indirect cylinder and C-plan arrangement with what appears to be a single pipe CH circuit! (... World copper shortage...) Switchmaster mech programmer and Satchwell (horizontal dial) stats.
There is two room stats, one in living room and the other in the hallway. There is no cyl stat. There is an immersion heater installed.
The pump 'appears' to be in the return of the CH circuit.
The F&E feed goes to the bottom of the cyl coil and the vent to the top.
With regards to control upgrade what can be done?
It's probably better to upgrade the system to S or Y plan fully pumped if I'm not mistaken. But what's best for Part L and improving current control?
Thanks in advance for any advice.
UselessFcuk