I am renovating a barn and need to run cables under the floor as the roof is open to the eaves and it is single story. I think the options are pvc conduit in the insulation layer below the screed which makes it deep enough to prevent damage or possible running it along the walls near the roof. Any suggestions and comments if these are legal. I intend to get the local authority to inspect under a building notice but want to be sure of howe to approach the work.