Hi.
I'm not sure the best order to get the installs done in my kitchen.
I have already has the plastering done.
I also have all new electical wiring handing loose
I've just completed installing the waste and water pipes ready for the units.
To cut to the chase the gas man says call me once the units and worktop are in. But this would mean he will need to run the pipes under the cabinets. will this be possible ?
The other option I have is to cut a section from the bottom of each cabinet. However I can't see that this idea would help him unless he does the install in 2 parts.
ie.
1) install piples
2) I then get the cabinets fixed to the wall
3) I then get the worktop cut and fitted
4) get him back to connect the cooker and hob
Any advice on what others might / have done
I'm not sure the best order to get the installs done in my kitchen.
I have already has the plastering done.
I also have all new electical wiring handing loose
I've just completed installing the waste and water pipes ready for the units.
To cut to the chase the gas man says call me once the units and worktop are in. But this would mean he will need to run the pipes under the cabinets. will this be possible ?
The other option I have is to cut a section from the bottom of each cabinet. However I can't see that this idea would help him unless he does the install in 2 parts.
ie.
1) install piples
2) I then get the cabinets fixed to the wall
3) I then get the worktop cut and fitted
4) get him back to connect the cooker and hob
Any advice on what others might / have done