Any one know who you get to check over a central heating installation to ensure it's been done to standard??
Just need to be sure before i put down my oak floor as theres a lot of push fit tee pieces and loops of plastic pipe from the main feed pipe to the rads. not straight lines pinned to the joists ( this may be done right i'm not sure it just looks a bit shabby and rushed) they just seems to spiral from the main feed to the rads like a curly fry's maybe 600mm-800mm of pipe
Thanks
Just need to be sure before i put down my oak floor as theres a lot of push fit tee pieces and loops of plastic pipe from the main feed pipe to the rads. not straight lines pinned to the joists ( this may be done right i'm not sure it just looks a bit shabby and rushed) they just seems to spiral from the main feed to the rads like a curly fry's maybe 600mm-800mm of pipe