Hey guys,
So basically my garden is probably about 9m by about 5m. The first 3.5 metres outside the back door is patio then the rest is lawn/mud.
I wanted to install a picket fence to separate the patio from the grass but I need to install about 5 drive in ground spikes for the posts.
Well that was my plan. Is there a safer way to do the posts like maybe digging and concreting them in and how deep would it have to be? I think the picket fence is about a metre high.
I asked the gas, water and electric companies for the cable plans. Is that the right way to go?
It doesn't feel like there would be any cables or pipes under there but I would rather be sure.
Would appreciate any advice. Thanks in advance.
So basically my garden is probably about 9m by about 5m. The first 3.5 metres outside the back door is patio then the rest is lawn/mud.
I wanted to install a picket fence to separate the patio from the grass but I need to install about 5 drive in ground spikes for the posts.
Well that was my plan. Is there a safer way to do the posts like maybe digging and concreting them in and how deep would it have to be? I think the picket fence is about a metre high.
I asked the gas, water and electric companies for the cable plans. Is that the right way to go?
It doesn't feel like there would be any cables or pipes under there but I would rather be sure.
Would appreciate any advice. Thanks in advance.