Hi, could. You please give me some help?
I have a clinch wall to render and skim internal, ( hacked off to 1 m due to flood)
I need to come in the same line as the top half but it is 100mm thick in places! Do I need to rough level out before eml or other way round?
Existing is eml then rendered. Bit stuck really,
Thanks wise ones
I have a clinch wall to render and skim internal, ( hacked off to 1 m due to flood)
I need to come in the same line as the top half but it is 100mm thick in places! Do I need to rough level out before eml or other way round?
Existing is eml then rendered. Bit stuck really,
Thanks wise ones