I have recently layed a 100mm concrete slab for living room floor and wish to lay a wooden laminate floor over it, but when is it cured (dried out) enough to put the laminate floor down?
To soon and I feel I will be preventing the slab from dry out because of the slab dpm and the laminate moisture barrier sheet will stop evaporation.
advice appreciated!
Thanks in advance.....
To soon and I feel I will be preventing the slab from dry out because of the slab dpm and the laminate moisture barrier sheet will stop evaporation.
advice appreciated!
Thanks in advance.....