I have just spent all day plastering a small porch about 1.5 x 1.8m.
This porch is then divided into 2 areas, one part is going to have a toilet fitted?????????? the other is the porch I suppose.
Anyway this small area had a total of 21 different faces that needed plastering/beading plus the ceiling and it took all frigging day! The bog area had two windows to boot.
Is this a record for a pain in the arse job, I couldn't fit myself and the hawk in these spaces and had to do loads of it left handed and kept bashing opposite walls with trowel. It was so small I had to do one wall at a time because I would have to lean against them to get at the opposite ones, good grief..I'm off to the pub.
This porch is then divided into 2 areas, one part is going to have a toilet fitted?????????? the other is the porch I suppose.
Anyway this small area had a total of 21 different faces that needed plastering/beading plus the ceiling and it took all frigging day! The bog area had two windows to boot.
Is this a record for a pain in the arse job, I couldn't fit myself and the hawk in these spaces and had to do loads of it left handed and kept bashing opposite walls with trowel. It was so small I had to do one wall at a time because I would have to lean against them to get at the opposite ones, good grief..I'm off to the pub.