Looks like BAS's interpretations of good plumbing are questionable as well.
In addition, I don't like the look of those tight 90' bends in his earth cables. Could possibly be a Code 2 for those! Only two earthing cables from the MET - so I'm guessing there 'could' be a main bond missing or (dare I say it) a main earth to CU missing. No supports on earth cable - Code 4.
MET not labelled either.
From what I've seen so far, it's looking like an Unsatisfactory if a PIR were done.
In addition, I don't like the look of those tight 90' bends in his earth cables. Could possibly be a Code 2 for those! Only two earthing cables from the MET - so I'm guessing there 'could' be a main bond missing or (dare I say it) a main earth to CU missing. No supports on earth cable - Code 4.
MET not labelled either.
From what I've seen so far, it's looking like an Unsatisfactory if a PIR were done.
