i put a new bathroom suite in, i cut copper pipes in floorboards feeding radiator, bath and sink, there were 22mm and 15mm,
i used speedfit plastic to take it to shower,bath, and sink and a heated towel rail.
so from the coper i cut going in to bathroom it only has isolation valves and flexi pipes to bath and sink which are metal.
my question is,
i removed all old copper pipes in batroom and discarded, now i have ordered some 4,, earth clamps, where do i have to put them, ??
ive read it has to go to consumer unit earth bar, or do i just connect both pipes i cut and put strap between them in airing cupboard so it can be seen.
im confused.
i used speedfit plastic to take it to shower,bath, and sink and a heated towel rail.
so from the coper i cut going in to bathroom it only has isolation valves and flexi pipes to bath and sink which are metal.
my question is,
i removed all old copper pipes in batroom and discarded, now i have ordered some 4,, earth clamps, where do i have to put them, ??
ive read it has to go to consumer unit earth bar, or do i just connect both pipes i cut and put strap between them in airing cupboard so it can be seen.
im confused.