A switched FCU, taken from the ring main to isolate the the fire itself.
The cable from the fused spur, does it have to go ceiling/floor, then either back up/down to the un-switched socket that'll be behind the fire? Or, is it ok to run the cable directly horizontally between the FCU and socket?
Cheers.
The cable from the fused spur, does it have to go ceiling/floor, then either back up/down to the un-switched socket that'll be behind the fire? Or, is it ok to run the cable directly horizontally between the FCU and socket?
Cheers.