Could someone help with a couple of questions.
I live in a 1940`s semi, about 6 years ago I had it rewired new consumer unit etc. It was earthed through the Gas main pipe. I understand this is now unsatisfactory, also the feed into the house comes from the adjoining semi which is only 2 cores of braided cable, is this acceptable.
Also the meter is very noisy even with no load on it.
Who is responsible for these items?
We are supplied by Scottish Power but are they responsible for cabling and meters.
Thanks in advance.
JonB
I live in a 1940`s semi, about 6 years ago I had it rewired new consumer unit etc. It was earthed through the Gas main pipe. I understand this is now unsatisfactory, also the feed into the house comes from the adjoining semi which is only 2 cores of braided cable, is this acceptable.
Also the meter is very noisy even with no load on it.
Who is responsible for these items?
We are supplied by Scottish Power but are they responsible for cabling and meters.
Thanks in advance.
JonB