Hi all,
I had my garage footings poured yesterday and there is a low spot in one of the corners (my fault cos im crap and it was I who pegged and levelled it). Its a difference of around an inch maybe 1.5 inch. So im a bit worried. I plan on laying 2 courses of block which will take me up to dpc and fill the middle with hardcore and slab. Can I make this difference up by using more mortar under the first course or will this weaken the blockwork?
Thanks for any help
Pippo
I had my garage footings poured yesterday and there is a low spot in one of the corners (my fault cos im crap and it was I who pegged and levelled it). Its a difference of around an inch maybe 1.5 inch. So im a bit worried. I plan on laying 2 courses of block which will take me up to dpc and fill the middle with hardcore and slab. Can I make this difference up by using more mortar under the first course or will this weaken the blockwork?
Thanks for any help
Pippo