Gaps in new paving slaps

Joined
15 Mar 2009
Messages
14
Reaction score
0
Location
Aberdeen
Country
United Kingdom
Hi,

I've recently had a small area paved with slabs. The last part the builder did was to sweep some sand / sandy-looking-stuff ( :lol: ) over it. My question is if all the gaps should be filled? The majority are not and I don't know if it matters or not. The gaps are very small.

Thanks for any feedback.
 
Ideally they should be entirely filled to prevent water getting under the slabs and moving the sub base.
 
It sounds like kiln dried sand joints Is it on small flags like 400x400mm or block paving.

They should be filled but it needs to be done in bone dry weather preferably when it has been dry for a day previous as well.
 
A joint less than 5mm will have to be jointed with dry sand.

More than 5mm and it will need mortar or jointing compound of some kind.

Get them back to sort it out.

Can you post a picture?
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top