Folks
I'm setting out decking posts and plan to set them using Hanson Postfix (apparently better than Postcrete accroding to the forum).
The hole will be 300 x 300 x 700 deep. This is twice the depth of the instructions set out in Hanson's advice. Do I complete one bag as per the instructions, allow it to set and then do a second or do i mix both at the same time?
Help much appreciated