i would appreciate a Bit of advice please as there is conflicting views on the site.
I have laid 18mm wbp ply on a bathroom floor after ripping up the old chipboard floor.
- should I use 6mm hardie boards on the floor and are they stuck to the ply floor with tile adhesive and screwed? Also do I pva the ply first?
- I have also build a 800mm shower cubicle with 12mm hardie board around the tray. Do I need to tank the hardie board cubicle or do I tile straight onto the hardie board?
Thanks in advance