got a 900mm quadrant from wickes today for £199.
I need to build a platform to raise the tray in order to run pipework as well as make a partition to allow me to run the pipes for my thermostatic shower. BTW waste will run 65" along the wall before going into stack.
1. What size timber do i need for the base, 4"x3" or 3"x2"? or bigger
2. Do I need to tile before fitting enclosure or after?
3. Whats the best way to construct the base to allow the waste pipe to be accesible?
4. Also as its on the end, I wont be able to put any supporting timber there, will this affect stability?
5. Will be be ok to contruct straight on top of floorboards?
Here is a picture of the tray to show waste position
Many thanks in advance for any help received
I need to build a platform to raise the tray in order to run pipework as well as make a partition to allow me to run the pipes for my thermostatic shower. BTW waste will run 65" along the wall before going into stack.
1. What size timber do i need for the base, 4"x3" or 3"x2"? or bigger
2. Do I need to tile before fitting enclosure or after?
3. Whats the best way to construct the base to allow the waste pipe to be accesible?
4. Also as its on the end, I wont be able to put any supporting timber there, will this affect stability?
5. Will be be ok to contruct straight on top of floorboards?
Here is a picture of the tray to show waste position
Many thanks in advance for any help received