Hi,
We recently had a concrete base built in our back garden with a view to build a garden office at some point in the future. As the concrete base was being built the builders offered the option to put in a toilet soil pipe and hot and cold pipes underneath the base as this can't be done at later stage they said. They are not connected but just placed in case down the line it is needed. Picture attached. I'm not convinced the hot and cold pipes are right but the builder maintained it is correct. Is there any truth in this?
Thanks.
Dean
We recently had a concrete base built in our back garden with a view to build a garden office at some point in the future. As the concrete base was being built the builders offered the option to put in a toilet soil pipe and hot and cold pipes underneath the base as this can't be done at later stage they said. They are not connected but just placed in case down the line it is needed. Picture attached. I'm not convinced the hot and cold pipes are right but the builder maintained it is correct. Is there any truth in this?
Thanks.
Dean