I have moved into a new property and have recently pulled up the boards on the landing.
The House currently has a combi boiler and has had a hot water cylinder in the past.
I was wondering if anyone can provide a diagram of how the pipework is usually linked out when changing from a gravity system to a combi system. For some reason The shower in the bathroom has its own hot water supply in 15mm that I assume is linked out in the old pipework. The bath hot water and kitchen hot water are fed from the main 22mm from the boiler.
The House currently has a combi boiler and has had a hot water cylinder in the past.
I was wondering if anyone can provide a diagram of how the pipework is usually linked out when changing from a gravity system to a combi system. For some reason The shower in the bathroom has its own hot water supply in 15mm that I assume is linked out in the old pipework. The bath hot water and kitchen hot water are fed from the main 22mm from the boiler.