

I discovered a hole in ma footings (probably a matching hole on other side of the opening too). I want to block it up just so the footings don't get water logged. I'm not concerned about the structure at this stage.
I have photos when the extension was built (to a budget) in 2012:
(the footings were flooded soon after being dug, he snagged a pipe with the digger, doh!! - dry now)
My current plan is to dig out to reveal the full extent, then shove some engineering bricks in there with mortar as required.
Anything else I should be doing?
Nozzle
Last edited:

