How long to dry out wet concrete sub floor?

JP_

Joined
17 May 2012
Messages
10,780
Reaction score
849
Country
United Kingdom
I had a leaking waste pipe that has been fixed for over week. The concrete below and around it (in the hole) still seems a bit discoloured, although much drier to touch. I have left a small fan blowing the area for a few days to try to speed up evaporation. The plumber that fixed the waste pipe was surprised how wet it seemed and suggested water might be rising up or getting in through the wall and finding the lower point. I am hoping it just needs more drying time.

Some pics:
IMG_20200720_130136514 (1).jpg


The air brick is new, and the blown pebble dash has only recently (1-2 weeks) been removed.

IMG_20200720_130246821.jpg


Drain looks OK, cannot see how water would be getting in, so hoping it is just a case that the concrete was really saturated and it is taking time to dry out completely.

IMG_20200720_130314515.jpg

How long do I leave it before investigating further? Plumber suggested the concrete outside where the manhole is needs to come out too - I removed the rest of the path a few months ago.

this was a on 4th July, so it has certainly dried a bit
IMG_20200704_171324020.jpg
 
Sponsored Links
You might find that the concrete has-been stained by the waste water so it looks wet when it's not
Have you wrapped kitchen towel around and flushed the toilet , ran water to see if the paper gets wet?
 
Yeah, the pipe is def. dry. Put plastic sheet under it with kitchen towel for 24 hours after it was sealed, all dry.

It is looking a bit lighter on the side under the fan, so maybe starting to dry out.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top