Hi,
For Kent, I'd expect labour costs to vary quite a bit depending on the condition of the property and how much preparation is needed.
As a very rough guide, I'd budget:
- Kitchen fitting: £2,500–£5,000 labour for a fairly standard kitchen, potentially more if you're moving plumbing, electrics or changing the layout.
- Bathroom refurbishment: £3,000–£6,000 labour for a complete refit, depending on tiling, plumbing and the amount of preparation involved.
- Painting and decorating: £2,500–£5,000 for the remaining rooms in a typical three-bedroom house, including wallpaper removal, assuming the walls don't need extensive repairs.
That could put the total labour somewhere around £8,000–£16,000, although I'd allow a contingency, particularly if you're stripping wallpaper and don't know what condition the walls are underneath.
One thing I'd clarify with the builder is exactly what's included in their price. Even if you're supplying the kitchen units and bathroom suite, consumables, plastering, waste removal, electrical work and unexpected repairs can add up.
I've actually built a free UK DIY cost comparison website called MyProjectCosts, which might help you work through some of the individual costs and decide which jobs are worth doing yourself:
Free UK DIY cost calculators and project planning tools. Compare DIY, hybrid and professional renovation costs, estimate materials and plan your budget.
myprojectcosts.co.uk
I'd definitely get at least three itemised quotes locally so you can compare the labour and materials separately.