Hi there,
Can anyone confirm how much MOT hardcore i would need please for the following dimension on my driveway :
7m x 4.5m
I need a compacted/finished depth of 50mm
I already have a solid hardcore base and this layer is simply bring the overall level up sufficiently to then gravel straight on top
I've found a number of online calculators which have returned everything from 2.6 bulk bag to 4.5 which seems to be a pretty wide and wild range !
Many thanks in advance !
Can anyone confirm how much MOT hardcore i would need please for the following dimension on my driveway :
7m x 4.5m
I need a compacted/finished depth of 50mm
I already have a solid hardcore base and this layer is simply bring the overall level up sufficiently to then gravel straight on top
I've found a number of online calculators which have returned everything from 2.6 bulk bag to 4.5 which seems to be a pretty wide and wild range !
Many thanks in advance !