Hi,
I need to replace the bathroom rad after all manner of problems with the bleed valve. The current pipe centres are 1000mm apart and the two closest Towel Rails I can find have pipe centres of 970mm, a difference of 30mm. The bathroom floor is tiled so I can’t lift the floor to adjust the pipes, so I’m stuck with pipes 1000mm apart and roughly 150mm in length from the floor to the valve. This leaves a difference of 30mm, 15mm per pipe.
Can anyone recommend how to fix the 15mm difference per pipe? I’ve searched through other posts in the forum but could not find similar posts. I would use a local plumber.
Thanks in advance
I need to replace the bathroom rad after all manner of problems with the bleed valve. The current pipe centres are 1000mm apart and the two closest Towel Rails I can find have pipe centres of 970mm, a difference of 30mm. The bathroom floor is tiled so I can’t lift the floor to adjust the pipes, so I’m stuck with pipes 1000mm apart and roughly 150mm in length from the floor to the valve. This leaves a difference of 30mm, 15mm per pipe.
Can anyone recommend how to fix the 15mm difference per pipe? I’ve searched through other posts in the forum but could not find similar posts. I would use a local plumber.
Thanks in advance