I need to dig down the solid floor of my 1930s property to install under floor heating.
I need to do this to get the heights level across the various rooms - I cannot get a "lay on top" system to work despite best efforts.
The system will look like this - exact model not shown but it is the prefabricated insulated boards with pre-routed pipe runs.
I estimate I need to take the floor down around 30mm to get levels correct but propose taking it down more in order to build it back up level.
My questions - and please note I know very little about building and ground work so I appreciate any advice given:
1. What tool used to break up the concrete - a Hilti ?
2. How much deeper to go in order to get a level surface to put the system on top of?
3. Do I need to put down a damp course?
4. What shall I use to level off the dug out surface?
5. Having never used a cement mixer, is there some sort of compound I can I mix in a bucket to level the surface?
6. The area is around 9 meters square - roughly how long would it take to dig out?
Thank you in advance for any help received!
I need to do this to get the heights level across the various rooms - I cannot get a "lay on top" system to work despite best efforts.
The system will look like this - exact model not shown but it is the prefabricated insulated boards with pre-routed pipe runs.
I estimate I need to take the floor down around 30mm to get levels correct but propose taking it down more in order to build it back up level.
My questions - and please note I know very little about building and ground work so I appreciate any advice given:
1. What tool used to break up the concrete - a Hilti ?
2. How much deeper to go in order to get a level surface to put the system on top of?
3. Do I need to put down a damp course?
4. What shall I use to level off the dug out surface?
5. Having never used a cement mixer, is there some sort of compound I can I mix in a bucket to level the surface?
6. The area is around 9 meters square - roughly how long would it take to dig out?
Thank you in advance for any help received!