I'm doing an unbound patio with concrete slabs. I have a recessed inspection chamber and I'm wondering what level to do it. I'm expecting the unbound slabs to sink by approx 2mm, but I suspect, they could sink by a different amount. My chamber lid will be bedded on mortar, so I'm not expecting that to sink.
Should I bed the chamber at the exact same height as the slabs or something different? Think will probably leave the chamber slightly high, which would mean it wouldn't puddle. I'm planning to use a sand/cement mix in the lid, so that will also go hard.